What are the similarities and differences between different

source:Zhong Ke Hua Feiclick:time:2017-09-22 10:32

The correct installation of wire rod assembly line and daily management are the most important factors that affect its performance. The location bar line installation involves the relationship between the lines, to the processing part of the assembly according to the requirements of the order, the overall layout should seriously consider the material flow, so as to shorten the route, reduce the workload of transportation. The day-to-day management involves the maintenance of the pipeline and so on. In conclusion, we should pay attention to the rational and scientific assembly of the flow process, but only if we do these preparations so that they can be operated reasonably and efficiently. For different forms of pipeline equipment, installation and management methods are different, today Xiao Bian to introduce two of them.
Installation and management of production line
The factory installed more and more use of the line quality is the first, but a link line layout design is very important, we will try to understand the need to pay attention to layout design and installation of pipeline contents.
The plane design bar line shall ensure that parts of the route is the shortest and the production is convenient for workers to operate, auxiliary service facilities, the most effective use of the production area, and consider the line installed between the articulation. To meet these requirements, the assembly line layout should take into account the form of the assembly line, assembly line installation, and other issues.
The production line and the automatic assembly line have straight lines, right angles, openings, rings and so on.
When the assembly line is installed, the work place should be arranged in accordance with the process line. When the process has more than two working places, the method of arranging the working place of the same working procedure should be considered. Generally, when there are two or more two odd work places, we should consider double row arrangement and divide them into two cases of the transportation route. But when a worker watches over a number of equipment, consider moving the worker as short as possible.
Production line is not from the beginning, and at the beginning, many enterprises product is staged production. Now instead of assembly line production, how to effectively control the water line production process?. Special arrangements for the following matters needing attention:
1, line control, the most important point is balance, do not have bottlenecks. Balance the production line is the most basic;
2, pay attention to the assembly line accumulation problem, once the assembly line on the accumulation, it is necessary to coordinate processing immediately;
3, the product distribution process should be uniform, personnel management discipline should be unified;
4, in the assembly line to specify a key process for quality control points, a group leader in the assembly line at the last station, initial inspection, some products can be repaired immediately.
5, calculate the beat and utilization rate, equipment intact rate and maintenance rate, material consistency etc.. The main thing is SOP's control
6, equipment, OEE index is very important (equipment utilization). But for the quality, it is important to put in a proper stay. Otherwise, the batch scrape will be serious.
Production line management is more important than the organization and design of pipeline, once the improper management, will work not completed, not up to the expected goal.
Two 、 installation and management method of wire rod assembly line
The plane design bar line shall ensure that parts of the route is the shortest and the production is convenient for workers to operate, auxiliary service facilities, the most effective use of the production area, and consider the line installed between the articulation. To meet these requirements, the assembly line layout should take into account the form of the assembly line, assembly line installation, and other issues.
When the assembly line is installed, the work place should be arranged in accordance with the process line. When the process has more than two working places, the method of arranging the working place of the same working procedure should be considered. Generally, when there are two or more two odd work places, we should consider double row arrangement and divide them into two cases of the transportation route. But when a worker watches over a number of equipment, consider moving the worker as short as possible.
Installation of pipeline involves the relationship between the lines, to the processing part of the assembly according to the requirements of the order, the overall layout should seriously consider the material flow, so as to shorten the route, reduce the workload of transportation. In a word, we should pay attention to the rational and scientific organization of water production process.
Line bar assembly line management method should pay attention to six points:
1, line control, the most important point is balance, do not have bottlenecks. Balance the production line is the most basic;
2, pay attention to the assembly line accumulation problem, once the assembly line on the accumulation, it is necessary to coordinate processing immediately;
3, the product distribution process should be uniform, personnel management discipline should be unified;
4, in the assembly line to specify a key process for quality control points, a group leader in the assembly line at the last station, initial inspection, some products can be repaired immediately.
5, calculate the beat and utilization rate, equipment intact rate and maintenance rate, material consistency etc.. The main thing is SOP's control.
6, equipment, OEE index is very important (equipment utilization). But for the quality, it is important to put in a proper stay. Otherwise, the batch scrape will be serious.